Our work day at bright sunshine with some images:

http://kurbahn-bad-bramstedt.de/index.php/de/galerie/category/38-arbeit-am-22-4-bei-strahlendem-sonnenschein

From 11 a.m. Mohammed, Andreas and Christian met and cleared away any leftovers on the tracks. (Wood, stones) Then it was time to build the track on the railway turnout, which was a little tricky, since here a switch follows a switch. Finally, Christian had the idea to save a few daffodils that had gotten lost in a heap (probably carried off from the clinic there?) And planted in front of the processing plant. The bunch will soon disappear, it would be a shame if the flowers were gone too.

 

 

Joomla templates by a4joomla